The Power Frequency Electric Field in 500kV Swtiching Yard with Considering the Earth Electrode

Li Yongming1,Wang Yangyang1,Luo Peng1,Xu Luwen2   

  1. 1. State Key Laboratory of Power Transmission Equipment & System Security and New Technology Chongqing University Chongqing 400044 China
    2. Chongqing Electric Power Test & Research Institute Chongqing 401123 China
  • Received:2015-06-18 Online:2015-10-25 Published:2020-01-03
  • Supported by:
    Project supported by National Natural Science Foundation of China(51277189);Program of Introducing Talents of Discipline to Universities(B08036);Fundamental Research Funds for the Central Universities(CDJXS12151108)

Abstract:

The distribution of power frequency electric field in the substation under the influence of the earth electrode is studied in this paper. Firstly, the charge simulation method for the calculation of power frequency electric field in switch yard is derived in this paper, and the electric field of 500kV switch yard is analyzed in a 500kV substation with the earth electrode. Secondly, the modeling of the substation is established. Finally, numerical results are compared to that of measurement for verifying the correctness of the model; then the power frequency electric field distribution in switch yard is analyzed whether the earth electrode of electrical equipment. This work provides an effective, efficient way for the calculation and analysis of the power frequency electric field in the substation with the existence of earth electrode.

Key words: Substation, switching yard, charge simulation method, electric field, earth electrode, the level of security