[1] |
E ON Netz GmbH B. Germany. Grid code-high and extra high voltage[S]. 2006.
|
[2] |
National Grid Electricity Transmission plc, UK. The grid code, issue 3, rev. 24[S]. 2008.
|
[3] |
Energinet D . Grid connection of wind turbines to networks with voltages below 100 kV, regulation TF 3.2.6[S]. 2004.
|
[4] |
Transenergie H Q . Transmission provider technical requirements for the connection of power plants to the Hydro-Quebec transmission system[S]. 2006.
|
[5] |
Federal Energy Regulatory Commission. U. Inter-connection for wind energy, final rule[S]. 2005.
|
[6] |
State Grid. Electric Power Research Institute (2012) GB/T 29319—2012 Technical requirements for connecting photovoltaic power system to distribution network[S].
|
[7] |
Zhang R, Cardinal M, Paul S , et al. A grid simulator with control of single-phase power converters in D-Q rotating frame[C]. IEEE Power Electronics Specialists Conference, 2002, 1431-1436.
|
[8] |
胡书举, 李建林, 梁亮 , 等. 风力发电用电网跌落发生器研究综述[J]. 电力自动化设备, 2008,21(2):101-103.
|
|
Hu Shuju, Li Jianlin, Liang Liang , et al. Review of voltage sag generator for wind power[J]. Power System Automation Equipment, 2008,21(2):101-103.
|
[9] |
王定国, 陈卓, 姚为正 , 等. 光伏并网逆变器低电压穿越检测方案分析[J]. 电力系统保护与检测, 2014,42(12):143-147.
|
|
Wang Dingguo, Chen Zhuo, Yao Weizheng , et al. Analysis of grid-connected PV inverter low voltage ride through testing scheme[J]. Power System Protection and Detection, 2014,42(12):143-147.
|
[10] |
王莹, 李洁斯, 刘芳 , 等. 多功能电网模拟器研究[J]. 电力电子技术, 2011,45(3):29-34.
|
|
Wang Ying, Li Jiesi, Liu Fang , et al. Research of multi-functional grid simulator[J]. Power Electronics, 2011,45(3):29-34.
|
[11] |
徐海亮, 章玮, 胡家兵 , 等. 可编程电网故障模拟电源的设计[J]. 电工技术学报, 2012,27(10):91-97.
|
|
Xu Hailiang, Zhang Wei, Hu Jiabing , et al. Design of a programmable grid-fault emulating power supply[J]. Transactions of China Electrotechnical Society, 2012,27(10):91-97.
|